Structural design for a 412,000 s.f., 2 story with 1 additional level below grade high school building consisting of a composite steel frame structure with infill non-lead bearing CMU and steel joist roof system. The design was reused at two other school sites for Gwinnett County, Peachtree Ridge High School and Mill Creek High School.
Client: Cunningham Forehand Matthews & Moore Architects
Contact Us | Site Map
© Pruitt Eberly Stone, Inc. | 1852 Century Place, Atlanta, GA 30345 | P: 770.457.5923 | F: 770.457.9989