
PES is pleased to announce that we have been awarded the National Oceanic and Atmospheric Administration (NOAA) National Water Center project. This is a design / build project teaming with the Beck Group.
This complex project, which will be fully designed and coordinated using Revit, is a new 58,000 sq. ft., two-story National Hydrologic Operations Center at the University of Alabama in Tuscaloosa, Alabama. PES will design the building structure to meet Blast and Progressive Collapse requirements as specified by ICS Physical Security Criteria for Federal Facilities for a Level 2 facility. The building will be modeled in BIM LOD 300.
Contact Us | Site Map
© Pruitt Eberly Stone, Inc. | 1852 Century Place, Atlanta, GA 30345 | P: 770.457.5923 | F: 770.457.9989